Lakestone build 2.0

Getting Stuck In

We have returned from holiday and the day we have all been waiting for has arrived, we have begun the build. Although Mike would like to attempt to build the lodge himself, sense (and regulations) have prevailed and he will work alongside experienced builder Colin Hunter! This week wasn’t really as exciting as all of those months of waiting had led us to believe. It was a lot of checking and rechecking to ensure everything was perfectly set up before we could begin the more exciting stuff!

Posted by Anna Bacchus on February 18, 2015